Tilcon – Millington

E&LP has performed various permitting and compliance activities for the site owners and operators at Millington Quarry for the last five years. In addition to preparing the SPCC and SPPP plans for the site, E&LP has prepared the yearly mine permits, Soil Erosion Plans, and mine plans. The site requires various permits from the NJDEP for air quality as well as maintaining a discharge permit to maintain the lake level at the lowest portions of the site. E&LP maintains both permits for the owner as well as performing all DMR and WCR sampling and reporting.

As the site transferred back into the control of the Mahan Group, E&LP continued to support them in the maintenance of their permits even as the site operations ramp down for ultimate reclamation and reuse as a residential development. We have assisted with the calculation of reserve areas for various rock as well as calculating the ultimate restoration grades and cover depths to comply with Township approvals for the restoration using only on-site materials.

Key Project Information

Client: Tilcon / Mahan Group

Location: Bernards Township, New Jersey

Services

Topographic Survey

Reserve Analysis

5 Year Mine Plan

Reclamation Plans

Soil Erosion Certifications

Spill Prevention Control & Countermeasure Plans

Stormwater Pollution Prevention Plans

Air Permitting/ Emissions Plan

Discharge Permitting & Sampling